[1]
Dorji, T. et al. 2025. Case Study on the Failure of 400kv XLPE Cables Termination of Tala Hydropower Plant through Electromagnetic Transient Analysis Using Mipower Software. Zorig Melong | A Technical Journal of Science, Engineering and Technology. 8, 2 (Aug. 2025), 25–31. DOI:https://doi.org/10.17102/zmv8.i2.003.