[1]
2026. Dam Break Analysis: A Case Study of the Tala Hydropower Plant Dam using HEC-RAS. Zorig Melong | A Technical Journal of Science, Engineering and Technology. 9, 1 (Aug. 2026), 14–27. DOI:https://doi.org/10.17102/zmv9.i1.010.