[1]
Wangmo, L. et al. 2015. Evaluation of Agile Construction in Managing Time Delays in the Bhutanese Construction Industry. Zorig Melong | A Technical Journal of Science, Engineering and Technology. 2, 1 (Jun. 2015), 11–16. DOI:https://doi.org/10.17102/zmv2.i1.003.