Dorji, T., Sharma, D. and Yangzom, T. (2025) “Case Study on the Failure of 400kv XLPE Cables Termination of Tala Hydropower Plant through Electromagnetic Transient Analysis Using Mipower Software”, Zorig Melong | A Technical Journal of Science, Engineering and Technology, 8(2), pp. 25–31. doi:10.17102/zmv8.i2.003.