Wangmo, L., Subba, M. and Sharma, R. (2015) “Evaluation of Agile Construction in Managing Time Delays in the Bhutanese Construction Industry”, Zorig Melong | A Technical Journal of Science, Engineering and Technology, 2(1), pp. 11–16. doi:10.17102/zmv2.i1.003.